I just returned from Maine. The weather was uncharacteristically beautiful with warm temperatures and clear skies. The leaves had not really started to turn and it did not seem like the last week of September.
We made a number of design refinements to the interior, clarified the spec in many places and began the design of the upper cabinets in the salon. I reviewed the preliminary layout of the electrical panel and we made some minor adjustments to the electrical system. The engine had been put back into the hull, the shaft fitted and the strut was being glassed in while I was there. As always it was a pleasure to work with the Lyman Morse staff.
I added some pictures of the furniture and joinery that has been fitted into the hull in anticipation of the deck being put into position in the next 2-3 weeks. I also added a few pictures of Maine and of the Lyman Morse facility.
The next big event is the Ft. Lauderdale Boat Show, the last week of October, where we will review our options for interior lighting and nav/comm electronics. We hope to make the final selection of lighting fixtures by mid-November.